Mind · Reasoning

MassAmplifiedError

A fixed error rate in a frozen model grows into a larger absolute error the more is invested in that model

Definition

Mechanism

When information is frozen at a point in time (an arrow's aim at release, a building's initial lean, a line of payment data) and MassAddition then scales it up, the error in that information scales too. The percentage error stays constant but the absolute error grows: the arrow misses by more the further the target, the tower leans further out the taller it gets, a data error costs more the more money is paid on it. So more ambitious targets demand more accurate initial information, and this becomes less likely the faster and larger the investment in one MonoModularity model. Keeping ShapeControl as mass grows requires adding information as you go; a MetaModularity system can do this from its own overlapping models, as overlapping photographs allow a scene to be enlarged.

Preconditions

  1. Information is fixed at a point and then invested in or scaled

Invariants

  1. At a constant error rate, absolute error is proportional to the mass added
  2. The tolerable error rate can only be set in advance if the total mass is known in advance
  3. Without new information, error in a frozen model cannot shrink as it is scaled

Risks

Failure modes

  1. Committing irreversibly to a plan for an ambitious target without a way to correct along the way

  2. Not knowing how much mass will eventually ride on a piece of information, so its quality standard is set too low

  3. Assuming a small percentage error is acceptable regardless of the scale it will reach

Relationships

Builds on

References

MassAddition

Committing investment (money, matter, energy, people or action) to the information an organisation currently holds

MetaModularity

A body plan that holds many overlapping but non-identical models of the same problem, ready to instantiate whichever fits

MonoModularity

A body plan in which one model processes every situation, treating each situation as just more data for the same process

ShapeControl

Keeping an organisation, model or trajectory close to a desired form or target, with information serving that form

Used by

References

CorrectAsYouGrow

When the total investment is not known in advance, add corrective information as mass is added, from more than one model

Reference

Identity

Ref
MassAmplifiedError#19b2
Sema ID
sema:MassAmplifiedError#mh:SHA-256:19b274047a79ec641a4d9db1074d82de3def8c245515a6d57ba7b7df605d6c70
Ring
2
Tier
2
Updated
2026-11-11